ARD-Y conducted a field visit to Dhu-bab District to monitor the progress of Al Wahijah Solar-Powered Water Project, following its handover to the contractor. The visit was attended by the donor’s engineer, the monitoring and evaluation team, and the site engineer, with the purpose of receiving and inspecting the raw materials to ensure quality standards are met.



